AC Cord (NEMA 5‐15P) to M19 Pushlock, 15’ rock-bottom The number of units required
Baker’s notes & crumb story
Description
AC Cord (NEMA 5‐15P) to M19 Pushlock, 15’ rock bottom The number of units required The number of units required depends on your total system airflow (CFM) and the severity of the odor or pollution problem The AF365 tracks the total number of hours in the life cycle of the unit